Galvanized sheet refers to a steel sheet with a layer of zinc on the surface. Galvanizing is a commonly used economic method to prevent the surface of the steel sheet from corrosion and extend its service life. A layer of metal zinc is coated on the surface of the steel sheet. It is an effective anti-rust method. About half of the world's zinc production is used in this process.
Due to different treatment methods in the coating process, the surface state of galvanized sheets varies, such as ordinary zinc spangles, fine zinc spangles, flat zinc spangles, no zinc spangles, and phosphating surfaces.



| Technical Specifications | |
|---|---|
| Grade | SGCC, DC51D, DX51D, DX52D, DX53D, DX54D, SGCD, SGHC, S350GD, S450GD, S550GD, etc |
| Length | 1-12m as customized |
| Standard | ASTM, GB, EN, BS, JIS, Etc |
| Zinc Coating | z30g-z275g /m2, or as client required |
| Usage | Corrugated steel sheet, Ceiling channel, industrial refrigeration, cold storage, door panel, sandwich panel, writing board, PCM steel plate |
| Delivery Time | Delivered within 3-7 days after receipt of deposit |
Immersing the steel in molten zinc. Steps include: Pretreatment (cleaning/degreasing), Dip plating (zinc reaction), Cooling and solidification, and Post-treatment inspection.
Depositing zinc through electrolysis. Steps include: Electrolyte preparation, Electroplating (zinc ion reduction on cathode), and Post-treatment cleaning/drying.


1. Metal protective ring & Waterproof wrapping paper
2. Wooden pallets or Wooden frames for fixing
3. Buckle & Steel wire ropes for fixing steel coils
4. Loading Ports: Tianjin, Qingdao, or Shanghai Port.






A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Usually our MOQ is 5 tons. However, for smaller quantities, the price may be slightly higher due to processing costs.
A: Yes, you can provide your drawings and we will produce accordingly. We can also design as per your requirements if you do not have a clear plan.
A: TT and L/C are acceptable. TT is preferred: 30% deposit before production and 70% balance before loading.
A: Please provide the product detailed size (width & length), total quantity, and the specific material grade required.